TOOLS2DONE BUSINESS GUIDE

Keep Every Trade Job Record Connected From Quote to Payment

Keep quotes, dates, job costs, invoices and payments linked to each trade job, so your team can see what happened and what still needs action.

A trade job creates information at every stage: customer details, site notes, a quote, accepted scope, dates, workforce bookings, supplier costs, variations, invoices and payments.

The problem is not usually that the information is missing. It is that each part lives somewhere different.

Tools2Done gives each job a connected commercial record, helping you see what was agreed, what is happening, what has been spent, what has been invoiced and what remains unpaid.

One job should have one commercial trail

Consider a plumbing business replacing a boiler. The customer details are in the phone, the accepted quote is attached to an email, the installation date is in a calendar, the boiler receipt is in the van and the deposit is listed in a spreadsheet.

Each record exists, but the owner still has to reconstruct the job whenever there is a question.

A connected job record works differently. The customer, site, quote, booking, costs, invoices and payments all point back to the same project. The business can follow the work from the original enquiry through to the final commercial result.

Start with the customer, site and scope

Tools2Done projects connect the customer to the site, project brief, status and planned dates. The site address can default from the customer record or be changed where the work is taking place elsewhere.

From there, you can create a detailed quote containing the scope, line items, VAT treatment, notes, terms, reference images and a payment schedule. The customer can receive an online link to accept or decline it.

This creates a clearer starting point than relying on a brief message saying the customer is happy to proceed.

Carry the agreed job into the schedule

Once work is accepted, the delivery plan should stay connected to the agreement.

Tools2Done jobs can be scheduled as one or more separate working periods. Each period can include:

  • The date and time
  • The work planned for that visit
  • The location
  • The linked customer and project
  • Assigned employees or subcontractors
  • A calendar colour

This suits jobs that are completed over several visits rather than one continuous block. Assigned workers can receive the booking details by email, and customer booking confirmations can be sent when required.

If plans move, the project dates, status and diary can be kept in step instead of leaving different versions of the schedule in separate places.

Keep changes attached to the original work

An accepted quote is the baseline, but it is rarely the end of the commercial story. Customers request extras, site conditions reveal additional work and specifications change.

Tools2Done projects can hold quotes and variations together so the owner can see how the job developed. Off-schedule invoices can also be created for extra work, one-off deposits or other amounts that do not belong to the original payment stages.

This makes it easier to explain why the final amount differs from the first quote and reduces the risk of approved extras being forgotten at invoicing time.

See job spending rather than a pile of business expenses

A supplier purchase only becomes useful job information when it is allocated to the work that required it.

Tools2Done expense records can include the supplier, category, description, date, net amount, VAT, total, payment method, notes and a supporting receipt. Where the cost relates directly to a project, it can be linked to that job.

General costs such as insurance, rent or software can remain unallocated as business overheads. This prevents the cost of one customer job being confused with the wider cost of running the business.

Connect the quote to invoices and payments

Invoices can be created manually, from a quote, from an agreed payment stage or for the remaining project balance.

The job record can therefore show:

  • The original quoted value
  • The amount invoiced
  • Payments received
  • Project spending
  • The amount remaining to invoice
  • Forecast or actual profitability information

Invoices retain draft, sent, part-paid, paid, overdue or cancelled states, together with their payment history. This helps distinguish a job that has finished on site from one that is actually finished commercially.

Where a quote contains staged payments, an invoiced stage is locked so it cannot accidentally be raised a second time.

Give customers the right information without exposing internal records

A connected system does not mean every record should be visible to the customer.

Customers can receive links to quotes and invoices or be invited to a secure portal containing relevant project information, scheduled visits and customer-visible documents. Internal notes, expenses and profitability records remain part of the business's own management information.

This gives customers a practical place to retrieve their paperwork without turning your internal job costing into a customer document.

Know which jobs still need attention

A complete job record is useful only if it helps the owner take action.

The Tools2Done dashboard can highlight matters such as overdue invoices, quotes approaching expiry, sent quotes without a response, active jobs with no future diary booking and draft invoices waiting to be sent.

It also brings together upcoming work, sales pipeline information, customer deposits, completed-job performance and business costs. Instead of opening several systems to find the next problem, the owner gets a clearer attention list.

A practical record for a changing job

Imagine an electrician quotes £4,800 for a partial rewire. The customer accepts the quote and pays the agreed first stage. The work is booked over four visits.

During the first fix, the customer asks for six additional sockets. The electrician records the extra scope and price, adds the necessary materials to the job costs and schedules an additional visit.

The record can now connect:

  • The accepted original quote
  • The additional agreed work
  • Five scheduled visits and assigned workers
  • Material and subcontractor costs
  • The staged invoices
  • The extra-work invoice
  • Payments received and the final balance

The value is not simply having more digital documents. It is being able to see how those documents relate to the same job.

Built for the way trade work develops

Tools2Done was created around the working journey of a trade business: customer, quote, job, schedule, costs, invoice, payment and profitability.

It supports sole traders, partnerships and limited companies, with configurable references, quote and invoice terms, branding, tax settings and optional modules. The system can therefore reflect the business's own paperwork and workflow rather than imposing one identical process on every trade.

Owners and administrators can also download a complete portable archive of their Tools2Done records. Your business information is not intended to become useful only while viewed inside one screen.

Frequently asked questions

Do I need to enter the same customer details for every stage?

No. Customer and project records are designed to carry the relevant information into connected quotes, scheduling and invoices, reducing repeated entry.

Can I keep several visits against one job?

Yes. A booking can contain multiple separate working periods, which is useful where a project is completed in stages or around deliveries, drying times and other trades.

Can I record both project costs and general overheads?

Yes. Expenses linked to a project contribute to job-cost and profitability reporting. Unallocated expenses remain general business overheads.

Can customers see my internal job costs?

The customer portal and public links are for relevant customer-facing information such as quotes, invoices, visits and selected documents. Internal financial records are kept on the business side.

Does this replace my accountant?

No. Tools2Done provides operational records and management information, not a replacement for professional accounting, tax or legal advice. Dedicated read-only accountant access is included without using a normal paid team seat.

What should I put in each job record?

The accompanying guide, What Records Should You Keep for Each Trade Job?, provides a practical checklist covering the customer, accepted scope, variations, schedule, direct costs, invoices, payments and final result.

Start with one live job

Choose a job that has been accepted but has not yet started. Add the customer, site and scope, connect the quote, schedule the visits and record each cost and invoice as the work progresses.

By the end of the job, you should be able to understand the whole commercial history without searching through your notebook, inbox, calendar and spreadsheet.

See how Tools2Done can give the business side of every trade job one connected place.

Put the process into practice.

Tools2Done helps you keep the job, quote, costs, payment stages, invoices and business records connected from the start.

Start your 7-day free trial →